← All articlesCosts & pricing

How much does a kitchen remodel cost in Tampa?

A small Tampa kitchen starts around $11,900 and a medium one around $20,400 — then four decisions move the number more than everything else combined. What drives the price, and what's different about kitchens in Tampa.

A finished Tampa kitchen

Square footage sets your starting range. Everything else moves you within it or past it.

These are starting ranges, not final numbers. They are the base before you choose anything. Four decisions move that base more than all others combined:

  • Cabinet style and construction: up to +12% of base
  • Countertop material: up to +12.5% of base
  • New appliance package: up to +$20,000
  • Adding an island: up to about +$12,900

A medium kitchen at $20,400–$37,400 with upgraded cabinets, quartz, a full appliance package and an island is not a $29,000 kitchen. It is a $60,000-plus kitchen. That is not a markup — it is four decisions, each of which you can see priced before you make it.

What actually drives the number

Kitchen size

Square footage is the single largest cost driver because almost everything else scales with it. A 150-square-foot kitchen and a 300-square-foot kitchen do not differ by double the flooring — they differ by double the cabinet linear footage, more countertop square footage, more electrical circuits, and more labor days. Size sets your floor and your ceiling.

Measure wall-to-wall, including the space occupied by cabinets and appliances. Most Tampa homeowners underestimate by 15–20% because they measure only the walkable floor.

Vaulted kitchen with a tongue-and-groove ceiling and island seating
An open-plan kitchen: more cabinet run, more countertop and more circuits, not just more floor.

Cabinets

Cabinets are the largest single line item in a kitchen remodel — typically 30–40% of the total budget, and the decision that moves your bottom line more than any other. Stock cabinets run roughly $100–$300 per linear foot installed. Semi-custom lands at $150–$650. Full custom starts around $500 and climbs past $1,200.

Lead time matters as much as price. Stock arrives in one to three weeks. Semi-custom takes four to eight. Full custom runs eight to fourteen weeks, and it is the item most likely to hold up your entire project. We order cabinets as soon as the layout is final, not after the permit clears.

Deep green shaker cabinetry with a stone backsplash and brass pullsTeal corner cabinets with brass hardwareWhite perimeter cabinets with under-cabinet lighting and a pro range
Painted shaker in green, teal and white on recent Ceballos kitchens. Cabinets are usually 30–40% of the budget.

About the cabinet tariff: the number most articles get wrong

You have probably read that imported cabinet prices jumped 50% in January 2026. They did not. A 25% Section 232 tariff on imported kitchen cabinets and vanities took effect October 14, 2025. The scheduled increase to 50% on January 1, 2026 was rolled back within days, and the rate has stayed at 25%, now scheduled to rise no earlier than January 1, 2027.

Two things follow. First, if a contractor is padding your cabinet allowance for a 50% tariff, ask which one — because it did not land. Second, the 25% tariff that is in effect is real, it applies to imported components even inside domestically assembled cabinets, and Chinese-origin cabinets can face combined duty rates above 70% once anti-dumping duties stack on top. We price cabinets from named suppliers with the country of origin disclosed, so you can see which side of that line your quote sits on.

Countertops

Countertops move a kitchen budget by up to 12.5% of its base range, which on a medium Tampa kitchen is a swing of roughly $2,500 to $4,700. Material is most of it: laminate at the bottom, granite and quartz in the middle, quartzite and specialty stone at the top. Edge profile, waterfall ends and cutout count add from there.

Templating cannot happen until base cabinets are installed, then fabrication takes one to three weeks. This is a fixed sequential dependency, not a scheduling preference, and it is why countertop selection cannot be left late.

White oak island with inset drawers and a quartz topFarmhouse sink with a bridge faucet and white uppers
Countertops on a white oak island and along the sink run. Material choice can move the base range by up to 12.5 percent.

Layout changes

Keeping your existing layout is the single largest cost saving available to you, and moving it is the single largest avoidable expense. If sinks, ranges and dishwashers stay where they are, you avoid rerouting supply and drain lines, avoid new electrical homeruns, and avoid one to two weeks of schedule.

In Tampa this matters more than in most of the country, for one reason covered in detail below: most Tampa homes sit on a concrete slab. Moving a drain line means cutting the slab, and cutting the slab means demolition, plumbing, inspection, and concrete work that would not otherwise exist.

Removing a wall is a separate question again. If it is load-bearing, you need an engineer's letter, a beam, a permit, and a structural inspection. That is not a line item you can estimate from a photograph.

Appliances

A new appliance package can add up to $20,000 to a Tampa kitchen — enough on its own to move a project from one tier to the next. It is also the most flexible line in the whole budget, because appliances are the one major component you can buy yourself, on sale, on your own timeline.

Homeowners who supply their own appliances typically save meaningfully against a contractor-supplied package. The trade-off is that delivery timing becomes your responsibility, and an appliance that arrives late holds up the final inspection. We are happy either way; we ask only that you decide early, because cabinet dimensions depend on appliance specifications.

Professional range with red knobs set into white cabinetryHand-finished copper hood above a stainless rangePlaster range hood with a fluted front and sconces
Range and hood choices on Ceballos kitchens. Appliances are the widest single swing in the budget.

Permits and inspections

Permit fees are a small share of your budget — usually a few hundred dollars — but the permit timeline is one of the largest schedule risks in the project, and the requirement is more nuanced than most homeowners expect.

Under the City of Tampa's own code, floor covering, painting, wallpapering, cabinetwork, furnishings, decorations and shelving do not require a building permit regardless of the cost of the work. So a genuine cosmetic refresh — new cabinets in the same footprint, new counters, new flooring, paint — may need no building permit at all.

The moment you touch electrical, plumbing or mechanical systems, that changes. Tampa requires separate trade permits for each discipline, and every permit carries the Florida Building Permit Surcharge of 2.5% of permit value with a $4.00 minimum. A full remodel almost always crosses that line, because moving a single outlet or relocating a dishwasher supply triggers it.

Timelines depend entirely on which authority you fall under — see the next section.

Where Tampa is different

National cost calculators do not know any of this. It is why their numbers are wrong here.

Most Tampa homes sit on a concrete slab. There is no basement and usually no crawlspace, so drain lines run inside the slab. Relocating a sink or dishwasher means saw-cutting concrete, trenching, replumbing, inspecting, and repouring. In a home with a crawlspace this is an afternoon. Here it is a line item with its own permit.

Homes built between 1978 and 1995 may have polybutylene supply lines. Polybutylene was used extensively in Sun Belt states and degrades on contact with chlorinated municipal water; the material was pulled from the market after a $1 billion class action settlement in 1995. Many Florida insurers now decline or surcharge homes that still have it. If we open a wall and find grey flexible pipe stamped PB2110, we will tell you, and we will tell you before we price the repair. Whole-home repipes in Florida commonly run $6,500–$12,000 for a two-bath, single-story house.

Homes built between 1965 and 1973 may have solid aluminum branch wiring. The Consumer Product Safety Commission has found these homes are 55 times more likely to develop fire-hazard conditions at connection points than copper-wired homes. It is a manageable problem — CPSC-approved connector remediation is the usual fix and costs a fraction of a full rewire — but it is not a problem you want discovered on inspection day. If your kitchen is in a home from that window, we check before we quote.

Humidity moves cabinetry. Tampa runs high year-round humidity, and cabinet boxes with particleboard cores in unconditioned or poorly sealed spaces swell and delaminate. Plywood boxes and properly sealed finishes cost more up front. In this climate they are not an upsell.

Installing cabinetry
Cabinet install on a Ceballos kitchen. In Tampa's humidity, what the boxes are made of matters.

Hurricane season runs June 1 to November 30. It affects material deliveries, subcontractor availability, and inspection scheduling. A project whose cabinet delivery is scheduled for early September carries a real risk that a named storm moves it. We schedule around it rather than pretending it does not exist.

Three permitting authorities, three speeds

Which one you fall under depends on your address, not your postcode intuition. Typical residential plan review:

  • City of Tampa (addresses inside city limits): roughly 10–15 business days for standard residential; simple work can be faster.
  • Hillsborough County (unincorporated Hillsborough only): commonly quoted at 10–15 business days, though the county does not publish a guaranteed timeline and complex jobs run longer.
  • Temple Terrace / Plant City: separate departments, separate submissions.

Two further Tampa-specific requirements catch people out. Hillsborough County requires a recorded certified Notice of Commencement before the first inspection on most jobs above $5,000. And if your property sits in a designated historic district — Ybor City, Hyde Park, Tampa Heights, Seminole Heights — architectural review adds roughly 30 days and the reviewing commission meets monthly, so missing a meeting costs you a month rather than a week.

Why our number is usually higher than the cheapest bid

If you collect three quotes for the same kitchen, they will not be three prices for the same work. They will be three different definitions of the job. Here is what the cheap one usually leaves out.

The permit. A quote with no permit line is a quote that assumes you will not pull one, or that you will pull it yourself as an owner-builder and take on the liability personally. Unpermitted kitchen work surfaces at resale, at insurance renewal, and at the point a future buyer's inspector opens a panel.

Demolition and haul-off. Removing a kitchen produces several tons of debris. Someone pays for the dumpster and the disposal. If it is not in the quote, it is in a change order.

Real allowances, stated in dollars. "Standard grade cabinets" is not a number. "Builder's tile allowance" is not a number. When the allowance is a description rather than a dollar figure, the difference between the description and what you actually choose becomes an overage — and you find out at the worst possible moment. Every allowance in a Ceballos proposal is a dollar figure you can shop against.

Who we are not right for

If your budget for a full kitchen is under $11,900, we cannot do that work well, and you should know that from this page rather than after a wasted appointment.

What it costs

ItemTypical range
Small kitchenUp to 150 sq ft · galley or single-wall, layout kept · bungalows, condos, townhomes$11,900 – $20,400
Medium kitchen150–250 sq ft · semi-custom cabinets, quartz or granite · the most common Tampa kitchen$20,400 – $37,400
Large kitchen250–350 sq ft · open plan, island, more cabinet run and electrical$37,400 – $54,400
Extra large kitchen350+ sq ft · full custom scope, multiple zones, gut renovations$58,650 – $75,650

Starting ranges before your choices, from Ceballos kitchen projects in Hillsborough and Pinellas. Cabinets, countertops, appliances and an island move the number from here.

Get a range for your project
Watch

Eric explains it

Short clips from the jobsite on exactly this.

Swipe for more →

FAQs

Questions people also ask

How long will my kitchen be out of commission?

Six to ten weeks for most Tampa kitchens. Ten to sixteen if you have chosen custom cabinetry, since lead times drive the schedule more than the labor does.

Can I live in the house during the work?

Almost always yes for a single kitchen. We set up a temporary kitchen and seal the work area on day one.

Do you charge for the walkthrough?

No. We come out, measure, listen and give you a real number. If your budget and the project do not line up, we will tell you that in the driveway.

No cost, no obligation

Want a number for your own project?

A few quick questions, about forty seconds. Or call Eric on (813) 451-3695.

Get my price firstCall (813) 451-3695

Answered 7am–6pm, Monday to Saturday.

CallGet my price