Moody Organic Modern Primary Bathroom
The team at Ceballos Contracting completely re configured this space, extensive plumbing work was required to expand the shower, cap off an old tub deck, reposition the vanity plumbing to install new

Before & after


What we were asked to do
The team at Ceballos Contracting completely re configured this space, extensive plumbing work was required to expand the shower, cap off an old tub deck, reposition the vanity plumbing to install new wall mounted faucets with a 10 inch backsplash. The shower measures 10 feet in length with 4 feet in width. There are benches on both sides of the shower, the tile was cut at a 45 degree angle so that no schluter edging or pencil moulding was needed, just a clean, fluent look at the way around. The shower glass is broken up into three panels, the center is the door, the other two are wrapped around the benches. .
Costs on this project
This one was quoted per project rather than off a published range. The estimator will put you in the right bracket in about forty seconds.
Get my priceThe work



Want a number for your project?
A few quick questions, about forty seconds. Or call Eric on (813) 451-3695.


